摘要
结合沈阳地铁一号线云沈(云峰北街站—沈阳站站)区间土压平衡盾构到达接收施工技术,介绍了土压平衡盾构到达接收的技术内容、施工流程以及关键技术控制,为今后类似工程施工积累了宝贵经验。
Combined with the soil pressure balance shield arrival acceptance construction technology between Yunfengbeijie station and Shenyang station of Shenyang subway No.1 line,the technical content,construction process and critical technology control of soil pressure balance shield arrival acceptance were introduced,which accumulated valuable experience for similar engineering construction.
出处
《山西建筑》
2010年第12期314-316,共3页
Shanxi Architecture
关键词
盾构
施工技术
端头
shield
construction technology
end socket