摘要
介绍了利用CFG桩处理埋藏古沟槽沉积地层时,采用不同的置换率、桩长、桩间距进行加固处理,从而在满足设计地基承载力和变形要求的同时,消除地基土的不均匀性。
Introduces the CFG pile in the treatment of sedimentary formation where ancient gutter buried,by adopting different replacement ratio and different pile length,and strengthening the space between piles,it satisfies the demand of designed foundation bearing capacity and deformation as well as eliminates the unevenness of ground soil.
出处
《山西建筑》
2010年第12期92-94,共3页
Shanxi Architecture
关键词
CFG桩
古沟槽
处理
CFG pile
ancient gutter
treatment