摘要
通过包西铁路通道陕西段路基土方填筑施工过程的实践,分析总结影响路基分层压实系数一次验收合格率的多种因素,有针对性地制定相应工程措施,指导施工生产。
According to the repeatedly practice of the earthwork Filling during roadbed construction of Aeeording to the repeatedly practice of the earthwork filling during roadbed construction of Baoxi Railway in Shaanxi province, through the analysis and summary of all factors which influence percent of acceptance pass of the roadbed compacting coefficient, some main factors were found. In order to instruct the construction better in the future, some engineering measures were established in this paper.
出处
《铁道建筑技术》
2010年第3期130-133,共4页
Railway Construction Technology
关键词
路基
压实系数
验收合格率
roadbed
compacting coefficient
percent of acceptance pass