摘要
以武广客运专线连江隧道工程为例,联系该隧道地质水文条件,分析了锚杆施工中出现的问题,结合锚杆在施工中的作用及效果,针对性地提出了合理的解决途径及改进措施,保障了施工进度和工程质量。
Taking Lianjiang tunnel project along Wuhan to Guangzhou special line as an example, the paper relates to the geological and hydro- logical condition of the tunnel, the paper analyzes the problems in the anchor construction, and combines the anchor' s role and effect in the construction, and points out the solution channels and improvement measures, so as to ensure the construction progress and project quality.
出处
《山西建筑》
2010年第11期303-304,共2页
Shanxi Architecture
关键词
隧道
新奥法
锚杆
围岩
解决措施
tunnel, new Austrian method, anchor, surrounding rock, solution measures