导弹武器系统研制阶段风险评估模型 被引量:3

Research on the Risk Assessment Model of Missile Weapon System Development Phase
下载PDF
导出
摘要 基于模糊理论,根据导弹研制过程分析导弹研制阶段失败的原因,建立了概率风险评估方法(PRA)模型,采用了层次分析法(AHP)对导弹武器系统研制阶段进行了综合的风险评估,结合实例给出了解决实际问题的方法,此评判法为决策者提供了依据,辅助项目研制人员有重点地对原计划进行修正,最大程度地降低研制的风险。 Based on the fuzzy theory, the PRA model,which analyzes the cause of missile development failure and adopts the AHP method to carry on the risk assessment in the development phase of the missile system,is established. Then the method to solve practical problems is given with an example. It can give a basis for decision-makers and assist program-developers to modify the prior plan if necessary, which can reduce the development risk furthest.
出处 《火力与指挥控制》 CSCD 北大核心 2010年第3期61-64,共4页 Fire Control & Command Control
基金 研究生学位论文创新基金资助项目(DY09204)
关键词 AHP 导弹武器系统 风险评估 AHP, missile weapon system ,risk assessment
  • 相关文献

参考文献4

二级参考文献12

  • 1Barney B. Roberts. The Benefits of Integrated Quantitative Risk Management[C]. the 12th Annual International Symposium of the International Council on Systems Engineering, Melbourne, Australia, July 2001 被引量:1
  • 2Bamey B. Roberts, Richard B. Bennett. Risk Management for the NASA/JPL Genesis Mission: A Case Study[C]. Http://www.NASA. gov 被引量:1
  • 3Jacob Burns, Jeff Noonan, Laura Kichak, and Beth Van Doren.NASA Risk Assessment and Management Roadmap[R]. Systems Engineering Capstone Conference, Hampton, VA, 2001 被引量:1
  • 4Barney B. Roberts. Integrated Risk Management: Results and Lessons-learned[C]. Proceedings of Risk Management Symposium Sponsored by the USAF, SMC and the Aerospace Corporation,February 8-11, 1999 被引量:1
  • 5Linda H. Rosenberg, Theodore Hammer. Continuous Risk Management at NASA [R ]. Presented at the Applied Software Measurement/Software Management Conference, San Jose, California.February, 1999 被引量:1
  • 6Audrey J. Dorofee, Julie A. Walker, Christopher J. Alberts, etc.Continuous Risk Management Guidebook[M]. Carnegie Mellon University, 1996 被引量:1
  • 7Michael Stamatelatos. Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners[R]. Office of Safety and Mission Assurance NASA Headquarters, Washington, DC.March 31, 2002 被引量:1
  • 8Christian P. Safety Risk Assessment and Management-the ESA Approach[J]. Reliability Engineering and System Safety,1995,49:303-309. 被引量:1
  • 9Pate-Cornell E, Dillon R. Probabilistic Risk Analysis for the NASA Space Shuttle: A Brief History and Current Work [J]. Reliability Engineering and System Safety,2001,74:345-352. 被引量:1
  • 10Jaynes E T. Prior Probability[J]. IEEE Tran. on Systems Science and Cybernetic. SSC-4, 1986:227-241. 被引量:1

共引文献40

同被引文献18

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部