摘要
介绍了山西省军区第七干休所住房改造工程所采取的钢筋工程、模板工程、混凝土工程等冬期施工主体结构的控制环节。
This paper introduces the control links for main structure in winter construction that were adopted in housing reconstruction project of No.7 Retired cadre Sanatorium in Shanxi Military Region including the reinforcement engineering, formwork engineering and concrete engineering.
出处
《科技情报开发与经济》
2010年第6期208-210,共3页
Sci-Tech Information Development & Economy
关键词
高层住宅楼
冬期施工
质量控制
high-rise residential building
winter construction
quality control