摘要
主要介绍1000MW级核电站常规岛设备汽水分离再热器预分离器和分离器分离原理,结构特点,分离效能影响因素,设计难点。
This paper introduces the principle on 1 000 MW MSR pre-separator and separator, the characteristic of structure, some factors of the infection on the separator efficiency, and the difficulty for the design.
出处
《东方电气评论》
2010年第1期67-69,共3页
Dongfang Electric Review