南水北调中线工程北京西四环段输水安全分析 被引量:1

Security Analysis on Beijing West Fourth Ring Reach of the Middle Route Project of the South-to-North Water Diversion
下载PDF
导出
摘要 水锤是保证长距离输水管道安全的重要技术问题,工程中要避免弥合水锤的发生,降低水锤压力。由于受施工条件的限制,水锤防护措施的安装施工有时非常困难,往往需要作适当调整。根据对南水北调中线京石段应急供水工程北京西四环段通气孔设计,将通气孔概化成半气垫式调压室进行输水管道水力过渡过程计算分析。通过多方案比较分析,低水头长距离输水管道通气孔的设置可以在增加其它安全措施的基础上适当增大设置间距。 Water hammer is the key point of security for long-distance water drainage pipes. Column separation water hammer must be avoided in any projects and hydraulic transient pressure should be decreased. But sometimes, water hammer protection works are very difficult to construct because of the limitation of poor construction conditions. And it is necessary to make a slight change of the positions of air vents. According to the design of air vents in the Beijing West Fourth Ring reach of the Middle Route Project of the South to-north Water Diversion,air vents can be simplified as semi-air cushion surge chambers to calculate the hydraulic transients. By comparison of some schemes,space intervals of air vents in low-water-head long-distance water diversion pipes can be slightly longer if there are some additional water hammer protection works already.
出处 《南水北调与水利科技》 CAS CSCD 2010年第2期10-12,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调中线 输水安全 优化 水力过渡过程 水锤 the Middle Route Project of South-to-North Water Diversion water supply security hydraulic transients water hammer
  • 相关文献

参考文献14

  • 1Anderson, A. , Sandoval-- Pena R. , Arfaie M.. Column separation behavior modes in a simple test rig[C]. In: Proceedings of the International Meeting on Hydraulic Transients with Water Column Separation, 9th Round Table of the IAHR Group, Valencia,Spain, 1991.33-50. 被引量:1
  • 2Bahzer, R. A.. Column separation accompanying liquid transients in pipes[J]. ASME Journal of Basic Engineering 89, 1967. 837-846. 被引量:1
  • 3王学芳等著..工业管道中的水锤[M].北京:科学出版社,1995:365.
  • 4欧阳建,付云升,钱德琳,石维新.南水北调中线总干渠(北京段)西四环输水暗涵线路选定[J].南水北调与水利科技,2008,6(1):246-249. 被引量:2
  • 5严煦世,范瑾初主编..给水工程 第4版[M].北京:中国建筑工业出版社,1999:526.
  • 6怀利E.R,斯特里特V.L.瞬变流[M].北京:水利电力出版社,1987:23-31. 被引量:1
  • 7杨开林著..电站与泵站中的水力瞬变及调节[M].北京:中国水利水电出版社,2000:385.
  • 8E. Benjamin Wylie, Victor L. Streeter, Lisheng Suo. Fluid Transients In Systems[M]. Prentice-Hall Inc. A Simon & Schuster Company Englewood Cliffs, New Jersey, 1993 : 37-42. 被引量:1
  • 9Bruce E. Larock, Roland W. Jeppson,Gary Z.. Hydraulics of Pipeline Systems[M]. USA New York: 1999 :322-331. 被引量:1
  • 10付云升.南水北调中线西四环暗涵工程动态设计浅析[J].南水北调与水利科技,2008,6(1):216-219. 被引量:1

二级参考文献10

  • 1[1]南水北调中线干线工程建设管理局.南水北调中线干线工程京石段应急供水工程(北京段)西四环暗涵浅埋暗挖施工技术导则(试行)[Z].北京:南水北调中线干线建设管理局,2005. 被引量:1
  • 2[2]北京市政工程规划研究总院.西四环立交桥咨询评估报告[R].北京:北京市市政工程规划研究总院,2005. 被引量:1
  • 3[3]王梦炽.地下工程浅埋暗挖技术通论[M].安徽:安徽教育出版社,2004. 被引量:1
  • 4[1]北京市水利规划设计研究院.南水北调中线京石段应急供水工程(北京段)可行性研究报告[R].北京:北京市水利规划设计研究院,2003. 被引量:1
  • 5[2]北京市水利规划设计研究院.南水北调中线京石段应急供水工程(北京段)西四环暗涵工程初步设计报告[R].北京:北京市水利规划设计研究院,2003. 被引量:1
  • 6河海大学,大干沟水电站引水系统过渡过程及模型试验研究报告,1996年 被引量:1
  • 7张瑞凯,南京水利科学研究院,1990年 被引量:1
  • 8道扬,南京水利科学研究院水工研究所,1990年 被引量:1
  • 9谷兆祺,挪威水电工程经验介绍,1985年 被引量:1
  • 10杨开林,董兴林.水电站长输水道管流气泡动力特性研究[J].水利学报,1998,29(11):6-16. 被引量:11

共引文献5

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部