简支变结构连续梁桥施工工序分析 被引量:3

A Study on Construction Orders of the Simply Supported-Continuous System
下载PDF
导出
摘要 主梁后浇结构层与墩顶梁端湿接头浇筑顺序以及墩顶负弯矩预应力筋张拉顺序是简支变连续梁桥施工的关键工序。文中通过大型有限元软件,对实际工程主梁后浇结构层与墩顶梁端湿接头浇筑的先后顺序以及墩顶负弯矩预应力张拉的先后顺序,进行详细分析,对预应力混凝土简支变连续梁桥的结构受力、施工工序进行初步探讨,以期更好地为工程服务。 The constructing procedure of the monolithic layer and the wet joints of the girders and the orders of straining the pre-stress force are the key orders of the simply supported-continuous system. This paper studied the orders of the monolithic layer and the wet joints of the girders with practical project. And also it established limited element model to analysis the order of the wet joints of the girders and straining pre- stress force to the structure. Through the contrasting analysis, we can achieve an elementary discuss of mechanics and construction towards the pre-stress simply supported-continuous system to better serve the project.
出处 《交通科技与经济》 2010年第2期89-91,94,共4页 Technology & Economy in Areas of Communications
关键词 简支变连续 湿接头 临时支座 整体化层 负弯矩 simply supported-continuous system wet slot support joint temporary prop united layer pre-stress straining
  • 相关文献

参考文献8

二级参考文献20

  • 1何林兴.预应力混凝土构件由简支变连续的新技术[J].国外公路,1995,15(6):17-22. 被引量:12
  • 2谢琪.结合光明桥谈先简支、后连续预应力砼连续梁的设计与施工[J].福建建筑,1997(1):29-31. 被引量:24
  • 3.JTJ023—B5.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,1985.. 被引量:1
  • 4徐兴 凌道盛.实体退化单元系列.固体力学学报,2001,22:1-1. 被引量:36
  • 5Maher K, Tadros Joseth A, Steve Holdsworth. A new technique to continuity in prestressed concrete members[J]. PCI Journal,1993,(9-10):30-37. 被引量:1
  • 6Joseph A Ficenec, Steven D Kneip, Maher K Tadros, Larry G Fischer. Prestressed spliced I-girders: Tenth Street Viaduct Project[J]. PCI Journal, 1993,(9-10):38-48. 被引量:1
  • 7Alan R Phipps, Q D Spruill Jr. Biloxi Interstate 110 Voaduct[J]. PCI Journal, 1990,(1-2): 120-132. 被引量:1
  • 8Peterman R J, Ramirez J A, restrained moments in bridges with full-span prestressed concrete form panels[J]. PCI Journal, 1998,(1-2):54-73. 被引量:1
  • 9Hyo-Gyoung Kwak, Young-Jae Seo. Shrinkage cracking at interior support of continuous pre-cast pre-stressed concrete girder bridge[J]. construction and building materials , 2002,(16): 35-47. 被引量:1
  • 10Hyo-Gyoung Kwak, Young-Jae Seo. Numerical analysis of time-dependent behavior of pre-cast pre-stressed concrete girder bridge[J]. construction and building materials , 2002,(16): 49-63. 被引量:1

共引文献19

同被引文献11

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部