期刊文献+

斯托克曼商业中心土胎模冬期施工技术 被引量:1

Winter Construction Technology of Soil Mould in Stockmann Nevsky Center
下载PDF
导出
摘要 圣彼得堡斯托克曼商业中心在冬期逆作施工中采用土胎模技术。在实际施工过程中,采用电阻丝对楼板混凝土进行加热,保温被覆盖、保温棚保温,以满足混凝土浇筑条件,并为后续混凝土养护提供条件,混凝土浇筑后养护时及时测温。通过计算混凝土水化热确定最终黏土温度。指出土胎模冬期施工工艺及注意事项。地下1层开挖完成后,采用土胎模法完成的混凝土顶板符合设计及当地规范要求。 Soil mould technology is adopted in winter construction of Stockmann Nevsky Center in St. Petersburg. Concrete slabs are heated by resistance wire, and coated with heat preservation quilt and shed to provide conditions for concrete pouring and curing. Moreover, concrete temperature is monitored in time during curing. Authors decide temperature of clay through calculating concrete hydration heat. Furthermore, construction technology and attention points of winter construction of soil mould are proposed. After excavation of first underground floor, the quality of concrete floor can satisfy requirements of design and local standard.
出处 《施工技术》 CAS 北大核心 2010年第1期33-35,40,共4页 Construction Technology
关键词 基础工程 逆作法 冬期施工 土胎模 施工技术 foundation engineering top-down construction method winter construction soil mould construction technology
  • 相关文献

参考文献8

  • 1徐至钧 赵锡宏.逆作法设计与施工[M].北京:机械工业出版社,2002.. 被引量:79
  • 2史广德,胡德均,邢克宣,王作林.深基础逆作法支撑柱的设置及节点的技术处理[J].施工技术,2002,31(1):28-29. 被引量:19
  • 3中国建筑科学研究院.GB50009-2001建筑结构荷载规范[S].北京:中国建筑工业出版社,2001. 被引量:20
  • 4《建筑施工手册》(第四版)编写组编..建筑施工手册[M].北京:中国建筑工业出版社,2003:2433.
  • 5TCHS0-302-2004 Code for design of foundation [ S ]. St. Prtersburg, 2004. 被引量:1
  • 6Architecture Committee of Russia. 3. 03. 01-87 Architecture standards and rules of concrete structure[ S]. Moscow, 1989. 被引量:1
  • 7Architecture Committee of Russia. СНиП 3. 01. 03-84 Architecture standards and codes of construction measuring code [S]. Moscow,1985. 被引量:1
  • 852-01-2003 Basic rule, architecture standards and codes of concrete and reinforced concrete[ S ]. Moscow,2004. 被引量:1