结合吉青岭隧道的工程实际,分析了浅埋偏压不良地质条件下隧道进口段的施工风险,提出了采取初期支护加强,短循环开挖,初期支护封闭等综合地质病害预防措施。
Based on the engineering case in Jiqingling tunnel, risk analysis was made on the construction of tunnel entrance in poor geological condition with shallow-buried and unbalanced pressure. Integrated prevention measures for geological diseases were put forward with early support strengthening, short cycling excavating and early support closing.
出处
《探矿工程(岩土钻掘工程)》
2010年第1期79-81,66,共4页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
吉青岭隧道
浅埋
偏压
进口段
风险分析
综合防治
Jiqingling tunnel
shallow-burying
unbalanced pressure
entrance
risk analysis
integrated treatment