摘要
从工程开工前准备工作和现场施工过程两方面阐述了吐哈油田气举中心钢结构厂房工程的质量控制措施,重点介绍了现场施工时钢结构基础工程、主体工程、门窗安装工程三方面的质量控制要点,以保证施工质量和进度。
The quality control measures of steel structural working in gas lift center in Tuha oilfield were explained from preparing working before starting operation and field construction process of engineering.The quality control points were introduced mainly from three aspects: steel structural foundational engineering,main engineering and fixing door and window engineering on field construction,so as to ensure the construction quality and process.
出处
《山西建筑》
2010年第7期205-206,共2页
Shanxi Architecture
关键词
钢结构厂房
质量控制
施工过程
steel structural working
quality control
construction process