工作研究在某笔记本测试线效率提升中的应用 被引量:9

The Application of Work-Study in the Efficiency Improvement of Laptop Test Line
原文传递
导出
摘要 针对某笔记本测试线存在的生产线平衡率低、工位安排不合理、移动距离过长等问题,提出运用工作研究方法加以解决。首先阐述了笔记本测试线的现状,然后用流程程序分析法改善其工艺流程,优化生产线的平面布局,最后对生产线的三个瓶颈工序,全功能测试、QC检验、点胶进行了调整改善。通过改进,缩短了搬运距离,提高了生产线效率,生产线平衡率由原来的72.6%提高到80.8%。 This paper applied the methods of work low balance rate, unreasonable process arrangement study to a certain laptop test lines, where and too long moving distance occurred. Firstly,the state quo of the laptop lest lines was described. Then, the product process and the layout were optimized. Finally, three bottleneck station of full-function testing, QC testing, and slicking glue water were improved. Through these, the moving distance was reduced, the product efficiency was enhanced,and the balance rate was increased from 72. 6% to 80. 8%.
出处 《工业工程与管理》 北大核心 2010年第1期121-125,共5页 Industrial Engineering and Management
关键词 工业工程 工作研究 生产线平衡 industrial engineering work study production line balance
  • 相关文献

参考文献4

二级参考文献4

共引文献8

同被引文献58

引证文献9

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部