红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工

Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam
下载PDF
导出
摘要 红石大坝泄洪消能工改造工程围堰,原设计采用斜墙低堰与心墙高堰结合的方式,斜墙低堰位于迎水侧,在其保护下进行心墙高堰的施工。但在斜墙低堰填筑粘土斜墙时,由于电站每天都要调峰发电,已填筑的粘土经发电水流冲刷、浸泡后泥浆化,并被冲走。为此,采用了一种兼具粘土心墙与斜墙特点的围堰形式,取得了较好的效果。在围堰拆除时,采取尽量推迟平压充水时间、合理规划弃渣场等措施,保证了良好的拆除质量和进度。 The type of inclined wall low weir combined with core wall high weir was designed. It was set that with the water retaining of the inclined wall low weir, construction of core wall high weir was carried out. But in construction, as discharge of power generation, filled clay was scoured and liquefied. Thus, a new cofferdam type which was of the both character of clay core wall and inclined wall was adopted, and good effect was achieved. In removal of cofferdam, measures such as postponed water filling and reasonable plan of spoil area were applied to ensure the quality and progress.
作者 张伟 张正平
出处 《大坝与安全》 2009年第4期67-70,共4页 Dam & Safety
关键词 消能工改造 围堰填筑 拆除 reconstruction of energy dissipation structures filling of cofferdam removal
  • 相关文献

参考文献1

  • 1消能工改造工程可研设计报告[R].中水东北勘测设计研究有限责任公司. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部