摘要
石太铁路客运专线桥隧相连,地形非常复杂,涵盖了四电所有的接口工程,将从工程概况、设计标准、接口设计和接口管理等方面作较为详细的介绍和重点提示。
The Shijiazhuang-Taiyuan DPL runs through complicated terrain, such as conjoint bridges & tunnels, and involves all interface work in communication, signaling, electric power supply and traction power supply. The article provides in detail the Shijiazhuang-Taiyuan line project general introduction, design standard, interface design & management.
出处
《铁路通信信号工程技术》
2009年第6期36-39,48,共5页
Railway Signalling & Communication Engineering
关键词
客运专线
接口
设计
配合施工
管理
Dedicated passenger line, Interface, Design, Supporting construction, and Management