摘要
结合广西宾阳县百合水库土坝的工程地质条件,有针对性地对土坝进行高压喷射灌浆防渗墙施工试验,并简要介绍了高压喷射灌浆成墙的施工工艺、参数选用及特殊问题的处理方法。
In view of the engineering geological conditions, high-pressure jet grouting cutoff wall construction test was conducted for the earth dam of Baihe reservoir located in Binyang County of Guangxi. A brief introduction was made on the construction technology, parameter selection and treatment of special eases of high-pressure jet grouting cutoff wall formation.
出处
《广西水利水电》
2009年第6期87-89,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
高压喷射灌浆
成墙
施工
方法
High-pressure jet grouting
wall formation
construction
method