期刊文献+

基于GA_GSQP算法的设备维修计划优化模型 被引量:5

Optimum maintenance scheduling of equipments based on GA_GSQP
下载PDF
导出
摘要 维修工作是提高设备可靠性、保证设备正常运行的有效措施,本文建立了维修费用约束下可靠性最大的预维修计划优化模型.该模型以平均可靠性为优化目标,考虑了维修费用、维修间隔、设备运行总时间等约束.本文建立的模型为一般非线性优化问题,设计了基于全局序列二次规划方法(global sequential quadraticprogramm ing,GSQP)的改进遗传算法(GA_GSQP)进行求解.最后,在算例中以GSQP算法、遗传算法和禁忌搜索算法的优化结果作比较,分析了所设计的GA_GSQP遗传算法的优化效果. Maintenance work plays an important role for the high reliability and normal operations of equipments or systems. This paper proposes a maximum reliability model of maintenance scheduling with the limitation of maintenance costs. The proposed model pursues the maximization of the average reliability of equipments considering the limitation of maintenance costs maintenance, intervals and total runtime. An improved genetic algorithm based on GSQP (GA_GSQP) is also proposed for searching the optimal solutions because the proposed model belongs to a nonlinear optimization. In case studies, the effectiveness and efficiency of GA_GSQP are discussed by comparing with GSQP, genetic algorithm, tabu search.
出处 《系统工程学报》 CSCD 北大核心 2009年第6期717-724,共8页 Journal of Systems Engineering
基金 国家自然科学基金重点资助项目(60634010) 北京交通大学科技基金资助项目(TJ07011)
关键词 遗传算法 设备维修计划 优化模型 genetic algorithms maintenance scheduling of components optimum models
  • 相关文献

参考文献29

  • 1Wang H. A survey of maintenance policies of deteriorating systems [ J ]. European Journal of Operational Research, 2002, 139(3) : 469 -489. 被引量:1
  • 2Higgins A. Scheduling of railway track maintenance activities and crews [ J ]. Joumal of the Operational Research Society, 1998, 49(10) : 1026 - 1033. 被引量:1
  • 3Hall R W. Scheduling and facility design for transit railcar maintenance [ J ]. Transportation Research, Part A, 2000, 34 (2) : 67 -84. 被引量:1
  • 4Sriram C, Haghani A. An optimization model for aircraft maintenance scheduling and re-assignment[J]. Transportation Research , Part A, 2003, 37 ( 1 ) : 29 - 48. 被引量:1
  • 5Ho T K, Chi Y L, Ferreira L, et al. Evaluation of maintenance schedules on railway traction power systems [J]. Proceedings of the Institution of Mechanical Engineers, Part F, 2006, 220(2): 91 -102. 被引量:1
  • 6Kim H, Hayashi Y, Nara K. An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TS [J]. IEEE Transactions on Power Systems, 1997, 12( 1 ) : 329 -335. 被引量:1
  • 7Burke E K, Smith A J. Hybrid evolutionary techniques for the maintenance scheduling problem [ J ]. IEEE Transactions on Power Systems, 2000, 15( 1 ) : 122 - 128. 被引量:1
  • 8Tsai Y T, Wang K S, Teng H Y. Optimizing preventive maintenance for mechanical components using genetic algorithms [J]. Reliability Engineering and System Safety, 2001, 74( 1 ) : 89 -97. 被引量:1
  • 9El-Sharkh M Y, El-Keib A A. An evolutionary programming-based solution methodology for power generation and transmission maintenance scheduling[J]. Electric Power Systems Research, 2003, 65( 1 ) : 35 -40. 被引量:1
  • 10应保胜,但斌斌,张华.生产计划和预防性维修计划的统筹优化模型[J].机械工程学报,2005,41(3):226-228. 被引量:14

二级参考文献31

  • 1刘丹杰.遗传算法的编码研究[J].甘肃科技,2004,20(6):112-112. 被引量:4
  • 2贾智伟,景国勋,张强,段振伟.基于三角模糊数的矿井火灾事故树分析[J].安全与环境学报,2004,4(6):62-65. 被引量:22
  • 3Smith J.Self-adaptation of mutation rates in a steady state genetic algofithm[C].In,proceedings of the third IEEE conference on Evolutionary Computation, Piscataway : IEEE Press, 1996 : 318-323. 被引量:1
  • 4S Baskar.Performance of hybrid real coded genetic algorithms[J].International Journal of Computational Engineering Science,2001;2(4): 583-601. 被引量:1
  • 5Ashayeri J, Teelen A. A production and maintenance planning model for the process industry. International Journal of Production Research, 1996, 34: 3 311-3 326. 被引量:1
  • 6Banerjee A, Burton J S. Equipment utilization based maintenance task scheduling in a job shop. European Journal of Operational Research, 1990, 45(2-3): 191-202. 被引量:1
  • 7Mendez C A, Henning G P. A continuous-time approach to short-term scheduling of resource-constrained multi-stage batch facilities. Computers and Chemical Engineering, 2001,25: 701-711. 被引量:1
  • 8Kutanoglu E, Sabuncuoglu I. Routing-based reactive scheduling policies for machine failures in dynamic job shops.International Journal of Production Research, 2001, 39:3 141-5 158. 被引量:1
  • 9Ho T K,Chi Y L,Wang J,Leung K K,Siu L K and Tse C T.Probabilistic load flow in AC electrified railways[J].IEE Proceeding:Electrical Power Application,2005,152(4):1003-1013. 被引量:1
  • 10Rausand M,Hoyland A.System Reliablity Theory:Models,Statistical Methods,and Applications(Second Edition).New York:John Wiley & Sons,2004. 被引量:1

共引文献107

同被引文献35

引证文献5

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部