工期与投资集成造价管理的变更控制技术研究 被引量:2

The Research of the Modification Control Technology in the Cost Management of Integrated Investment and Time Limit
下载PDF
导出
摘要 针对目前变更控制中存在的孤立性、滞后性等问题,提出了工期与投资集成造价管理的动态变更控制理念,以挣值管理方法为研究内容,分析工期与投资集成造价管理的变更控制的内涵.通过对工期与投资集成造价管理的变更控制计划的建立、优化和实施步骤的研究,探索一种比较完善的集成管理方法,并在它们之间寻求协调平衡,以追求项目经济效益的最终实现. The dynamical control concept of the cost management of integrated investment and time limit for a project is proposed and analyzed according to the problems such as isolating, lagging behind etc. existing in the modiffication control at present. A more completely integrated management method is explored through the study of setting--up, optimization and implementation steps of the modification control technology in the cost management of integrated investment and time limit plan in order to pursue the realization of the economic benefits.
作者 张玉萍
出处 《兰州工业高等专科学校学报》 2009年第6期44-47,共4页 Journal of Lanzhou Higher Polytechnical College
关键词 工期与投资 集成 造价管理 变更控制 技术研究 time limit and investment integrate the cost management the modification control technology research
  • 相关文献

参考文献5

二级参考文献14

共引文献70

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部