摘要
通过设置隔水帷幕,对基坑降水施工时间、降水对周围环境的影响、降水施工动态控制等进行分析,提出了基坑降水设计与施工应注意的几个问题。
Based on establishment of water seal curtain, some factors are analyzed, including construction time for foundation pit dewatering, the effect of surrounding environment and dynamic control of dewatering construction et al. Then, some problems should be considered while dewatering design and construction are presented in this paper.
出处
《土工基础》
2009年第6期37-39,共3页
Soil Engineering and Foundation
关键词
隔水帷幕
加固土体
基坑
降水
water seal curtain, soil body reinforcement, foundation pit, dewatering