摘要 对于设置调压阀以控制水锤升压的水电站,调压阀拒动工况的导叶慢关闭时间较长,作为调节保证计算关键参数的机组转速升高率可能随着慢关闭时间的延长而减小。本文基于考虑机组飞逸特性的解析计算公式分析了机组转速升高率在宽时间域内的变化规律,并且结合设置调压阀的水电站算例进行了进一步的验证分析。分析结果有助于全面了解和掌握各类水电站的机组转速瞬变特性。 In the hydropower stations using pressure regulating valve for water hammer control, the rising ratio of rotating speed, an important parameter in regulating guarantee calculation, may decrease with the valve closing time due to the slower closing law of guide vanes under no-action condition of pressure regulating valve. This paper analyzes the variation of rising ratio in wide time domain using the analytical formulas and the unit's runaway characteristics, and gives a test case to verify the analytical results. These results would help comprehensive understanding of the transient characteristic of unit' s speed of hydropower stations.
出处 《水力发电学报》 EI CSCD 北大核心 2009年第6期214-218,共5页 Journal of Hydroelectric Engineering
基金 国家自然科学基金资助项目(90610027)
关键词 水利水电工程 调节保证 转速升高率 调压阀 water resources and hydropower engineering regulating guarantee rising ratio of rotating speed pressure regulating valve
  • 相关文献

参考文献5

  • 1刘启钊主编..水电站 第3版[M].北京:中国水利水电出版社,1980:333.
  • 2水电站设计手册编写组.水电站机电设计手册,水力机械[M].北京:水利电力出版社,1983. 被引量:1
  • 3林亚一主编..水轮机调节及辅助设备 第2版[M].北京:中国水利水电出版社,1986:269.
  • 4杨建东,詹佳佳,蒋琪.机组转速升高率的若干因素探讨[J].水力发电学报,2007,26(2):147-152. 被引量:6
  • 5Wylie E B and Streeter V L with SUO Lisheng. Fluid transients in systems[ M]. New Jersey: Prentice Hall Englewood Cliffs, 1993. 被引量:1

二级参考文献3

共引文献5

同被引文献16

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部