葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法 被引量:9

The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
原文传递
导出
摘要 根据自动发电控制(AGC)和一次调频的应用情况,分析了目前葛洲坝水力发电厂AGC及机组一次调频控制模式潜在的配合缺陷,这些配合缺陷限制了其调控效果。提出了利用AGC延迟控制的方法改进AGC与一次调频配合的原则,通过试验和实际运行,取得了良好的效果。 According to the application of the automatic generation control (AGC) and primary frequency modulation, this paper analyzes the latent coordinate flaw of the present Gezhouba hydropower plant AGC and primary frequency modulation control pattern. Such coordinate flaws limit the effect of he regulation and control of the AGC and primary frequency modulation. The use of AGC delay control methods are proposed to improve the coordination of AGC with the primary frequency modulation. Testing and actual operation show that the results are satisfactory.
出处 《水电自动化与大坝监测》 2009年第6期34-35,39,共3页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 AGC 一次调频 延迟控制 AGC primary frequency modulation, delay control
  • 相关文献

参考文献8

二级参考文献18

共引文献63

同被引文献80

引证文献9

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部