摘要 通过工程实例,介绍了在无传统换撑(即地下一层楼板)条件下的一种换撑方案,即采用一排钻孔灌注桩作为挡土结构,坑内设置2道钢筋混凝土内支撑,钻孔灌注桩外侧设置2排深层水泥搅拌桩作止水帷幕,同时可防止淤泥挤入。实际开挖证明该换撑做法是安全、可靠的。 With an engineering case, the paper introduced a new support replacement plan when there is no condition for traditional support replacement construction. A row of bored cast-in-place piles are taken as retaining structure, 2 lines of steel concrete inner support in the excavation, 2 rows of deep cement mixing pile outside the piles as water-stop curtain which can prevent silt to get in. It is proved that this support replacement is safe and reliable.
作者 潘德来 陈跃
出处 《探矿工程(岩土钻掘工程)》 2009年第12期43-46,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 深基坑支护 换撑 墙板外侧边柱 先行回填土 deep excavation supporting support replacement edge column outside wallboard pre-soil backfill
  • 相关文献

参考文献3

  • 1浙江有色建设工程有限公司.浙江玻璃股份有限公司150t/d超薄浮法生产线及配套工程岩土工程勘察报告[R].2004. 被引量:1
  • 2浙江大学地基基础工程公司岩土研究所.浙江玻璃股份有限公司150t/d超薄浮法生产线熔化工段基坑现场监测总结报告[R]. 被引量:1
  • 32006.JGJ120-99,建筑基坑支护技术规程[S]. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部