基于期望值二层规划的输电线路检修计划优化 被引量:3

Optimization of transmission line maintenance scheduling based on expected value two-level programming
下载PDF
导出
摘要 针对输电线路检修计划优化问题(TMSOP),考虑负荷、发电机出力、线路故障率及检修资源的不确定性,建立基于期望值二层规划的优化模型.模型计及系统静态安全风险,对不安全现象的概率和后果进行综合评估,并将风险指标用静态安全控制成本来量化计入目标函数中.利用蒙特卡罗方法、内点法、粒子群算法和禁忌表等混合智能优化算法来求解模型的Nash均衡和Stackelberg-Nash均衡.优化结果不仅确定了线路检修计划和检修资源安排,还明确了检修期间输电网风险最低的运行方式.最后通过IEEE-RTS的算例验证了模型和算法的可行性. For solving the transmission-line maintenance scheduling optimization problem(TMSOP), the uncertainties of power system load, generator output, line failure rate and maintenance resource were analyzed. An optimization model based on stochastic expected value two-level programming (SEVTP) was established, taking the static safety risk of electrical system into consideration. This model synthetically evaluates the possibility and outcomes of uncertainty, plus the objective function quantifies the risk item in forms of static safety controlling cost. A hybrid intelligent optimization algorithm, combining Monte Carlo method, interior point method, particle swarm optimization (PSO) and tabu list, was presented to solve the Nash balance and Stackelberg-Nash balance of this model. The optimization outcome includes the line maintenance schedule and the arrangement for the maintenance resources, as well as the least-risk-operation style for the power system during the maintenance. Finally, the feasibility of this model and the solution was verified by an IEEE-RTS example.
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2009年第11期2067-2072,共6页 Journal of Zhejiang University:Engineering Science
关键词 输电网 检修计划优化 二层规划 风险管理 不确定性 混合智能优化 transmission network maintenance scheduling optimization two-level programming risk management uncertainty hybrid intelligent optimization
  • 相关文献

参考文献15

  • 1MARWALI M, SHAHIDEHPOUR S. A deterministic approach to generation and transmission maintenance scheduling with network constraints [J]. Electric Power Systems Research, 1998, 47(2) : 101 - 113. 被引量:1
  • 2MARWALI M, SHAHIDEHPOUR S. Integrated generation and transmission maintenance scheduling with network constraints [J]. IEEE Transactions on Power Systems, 1998, 13(3): 1063- 1068. 被引量:1
  • 3丁明,冯永青.发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):18-23. 被引量:56
  • 4MARWALI M, SHAHIDEHPOUR S. Short-term transmission line maintenance scheduling in a deregulated system [J]. IEEE Transactions on Power System, 2000, 15(3):1117-1124. 被引量:1
  • 5冯永青,吴文传,张伯明,孙宏斌,何云良.基于可信性理论的输电网短期线路检修计划[J].中国电机工程学报,2007,27(4):65-71. 被引量:52
  • 6KIM H, HAYASHI Y, NARA K. An algorithm for thermal unit maintenance scheduling through combined use of GA SA and TS [J]. IEEE Transactions on Power Apparatus and System, 1997, 2(1) : 329 - 335. 被引量:1
  • 7MOHANTA D, SADHU P, CHAKRABARTI R. Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation[J]. Electric Power Systems Research, 2004, 72(1): 73-84. 被引量:1
  • 8SHARKH M, KEIB A. Maintenance scheduling of generation and transmission systems using fuzzy evolution- ary programming[J]. IEEE Transactions on power System, 2003, 18(2):862-866. 被引量:1
  • 9SILVA A, ANDERS G, MANSO L.Generator maintenance scheduling to maximize reliability and revenue [C]// Porto Power Tech Conference. Portugal: IEEE, 2001. 被引量:1
  • 10LI Wen-yuan, KORCZYNSKI J. A reliability-based approach to transmission maintenance planning and its application in BC hydro system [J]. IEEE Transactions on Power Delivery, 2004, 19(1) : 303 - 308. 被引量:1

二级参考文献29

共引文献108

同被引文献35

  • 1王淑芬,万仲平,樊恒,肖昌育,黄要桂.基于二层规划的无功优化模型及其混合算法[J].电网技术,2005,29(9):22-25. 被引量:25
  • 2魏少岩,徐飞,闵勇.输电线路检修计划模型[J].电力系统自动化,2006,30(17):41-44. 被引量:39
  • 3卢明银,除人平.系统可靠性[M],北京:机械工业出版社.2008. 被引量:40
  • 4Bracken J,McGill J.Mathematical programming with optimization problems in the constraints.Operations Research,1973,21:37-44. 被引量:1
  • 5Yare Y,Venayagamoorthy G K.Optimal Maintenance E Scheduling of Generators Using Multiple Swarms-MDPSO Framework[J].Engineering Applications of Artificial Intelligence,2010,23(6):895-910. 被引量:1
  • 6Yare Y,Venayagamoorthy G K,Aliyu U O.Optimal Generator Maintenance Scheduling Using a Modified Discrete PSO[J].Generation,Transmission & Distribution,2008,2(6):834-846. 被引量:1
  • 7Geetha T,Shanti S K.Coordinated Preventive Maintenance Scheduling of GENCO and TRANSCO in Restructured Power Systems[J].Electrical Power and Energy System,2009,31(10):626-638. 被引量:1
  • 8Marwali M,Shahidehpour S.Short-term Transmission Line Maintenance Scheduling in a Deregulated System[J].IEEE Transactions on Power System,2000,15(3):1117-1124. 被引量:1
  • 9Li Wenyuan,Korczynski J.A Reliability-based Approach to Transmission Maintenance Planning and Its Application in BC Hydro System[J].IEEE Transactions on Power Delivery,2004,19(1):303-308. 被引量:1
  • 10YARE Y,,VENAYAGAMOORTHY G K.Optimal maintenance sched-uling of generators using multiple swarms-MDPSO framework. En-gineering Applications of Artificial Intelligence . 2010 被引量:1

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部