6[4]Rosenbrock H H.Flexible Manufacturing System in which the Openrator is not subservient to the machine[M].Manchester:Research project mines Urnist,1983. 被引量:1
10H H Rosenbrock. Flexible Manufacturing System in which the Operator is not subservient to the machine[M]. Research project mines. Urnist,Manchester, 1983. 被引量:1