期刊文献+

输电网的规划综合成本法及其应用研究 被引量:6

Study on integrated planning cost method and its application in power transmission grid planning and design
下载PDF
导出
摘要 针对电网发展日益受到土地、环境及风险评估等内外部条件约束的现状,提出一种输电网规划与项目决策的新方法。该方法基于全寿命周期管理的理念,以全社会成本为尺度,对输电网扩展方案的技术性和经济性进行综合评判,通过引入土地机会成本和风险评估方法实现了对电网征地和电网风险等关键因素的量化评估。与传统输电网的规划设计方法进行比对分析表明,该方法能够更加准确地计及输电网规划方案的长期性和全面性,为输电网规划设计技术经济比选方法的改进提供了参考依据。 The method of power transmission grid planning and decision should be improved when the exterior restrictions on grid development become more seriously. A new method based on Life Cycle Cost Theory was proposed, in which the whole society costs were looked as the criterion for comparing the technology and economy of power grid planning. Land opportunity cost and risk assessment were applied in the method which is not only a solution to the attention-gaining problems like land requisition and power supply reliability, but a research exploration and basic conclusion to improve current grid planning method. Through incorporated with traditional grid planning method, this method is proved to be more accurately for evaluating the grid planning, and a innovation in grid planning technical and economic comparison.
机构地区 国网能源研究院
出处 《中国电力》 CSCD 北大核心 2009年第12期1-5,共5页 Electric Power
基金 国家电网公司重大科技项目(SGKJ[2007]444)
关键词 电网规划 规划综合成本 土地机会成本 风险评估 power grid planning integrated planning cost land opportunity cost risk assessment
  • 相关文献

参考文献13

二级参考文献33

  • 1丁栋虹,马淑俊.影子价格与影子地价法[J].南京大学学报(哲学.人文科学.社会科学),1996,33(3):153-160. 被引量:5
  • 2张怡,滕乐天,凌平.浅析LCC管理在上海电力系统的应用[J].上海电力,2004,17(3):179-181. 被引量:17
  • 3吴奕亮,金家善,辜健,罗云.寿命周期费用技术及其应用要点[J].上海电力,2004,17(4):273-280. 被引量:19
  • 4吴次芳,许红卫,唐根年.城市零售商业用地的区位评价方法及其应用[J].城市规划汇刊,1995(1):51-54. 被引量:6
  • 5KUMAMOTO H,TANAKA K,INOUE K,et al.State-transition Monte Carlo for evaluating large,repairable systems[J].IEEE Transactions on Reliability,1980,R-29(5):376-380. 被引量:1
  • 6BILLINTON R,LI W Y.A system state transition sampling method for composite system reliability evaluation[J].IEEE Transactions on Power Systems,1993,8 (3):761-767. 被引量:1
  • 7UBEDA J R,ALLAN R N.Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation[J].IEE Proc.-Gener.Transm.Distrib.,1994,141(4):257-262. 被引量:1
  • 8BILLINTON R,JONNAVITHULA A.Application of sequential Monte Carlo simulation to evaluation of distributions of composite system indices[J].IEE Proc.-Gener.Transm.Distrib.,1997,144 (2):87-90. 被引量:1
  • 9BORGES C.Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments[J].IEEE Transactions on Power Systems,2001,16 (2):203-209. 被引量:1
  • 10SANKARAKRISHNAN A,BILLINTON R.Sequential Monte Carlo simulation for composite power systems reliability analysis with time varying loads[J].IEEE Transactions on Power Systems,1995,10 (3):1540-1545. 被引量:1

共引文献130

同被引文献24

引证文献6

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部