摘要 合同是项目管理的核心,衡量合同治理分解为项目合同的明确性、适应性和履行严格性三个维度,分别对应着合同的全过程控制。通过对项目管理者的调查分析,结合案例研究,表明在目前的项目管理中,已经建立了全面的合同管理意识,项目合同条款详尽明确,符合具体项目的特点,能满足项目管理的需要,但对项目实施过程中的严格性仍存在不同的理解,对索赔和变更的灵活程度更高。 The contract is the core of project management.Project contractual governance emphasizes three dimensionalities:the clarity of the contract,adaptability and implement strictly.These are corresponding with the process of contract controlling.The survey for the project managers and case study,shows that it has been established the comprehensive awareness about contracts in the project management presently.The contractual terms are clear,fitting to the characteristics of specific projects and could meet the needs of project management. However, there is the different understanding about administering contract strictly in the project implementation process. There are more flexibility on claim and changing.
作者 梁永宽 袁静
出处 《建筑经济》 2009年第12期24-27,共4页 Construction Economy
基金 中山大学-BP液化天然气中心资助项目(99103-9390001)
关键词 项目管理 合同治理 调查 案例 研究 project management contractual governance investigation case study
  • 相关文献

参考文献15

  • 1W. Wang, K Hawwash, J Perry. Contract type selector (CTS): a KBS for training young engineers[J]. International Journal of Project Management, 1996( 14):95-102. 被引量:1
  • 2S. Floricel, R. Miller.Strategizing for anticipated risks and turbulence in large scale engineering projects [J]. International Journal of Project Management, 2001 (19):445-455. 被引量:1
  • 3P.A. Thompson, J.G.Perry. Contract strategy in the 1990s [A].Proceedings of the 9th World Congress on Project Management Glasgow, 1988(9): 54-62. 被引量:1
  • 4J.R. Turner, S.J. Simister. Project contract management and a theory of organization[J]. International Journal of Project Management, 2001 (8): 457-464. 被引量:1
  • 5J. Hinze, J. Tada. General provisions critical to construction contracts [J]. Power Engineering, 1993 (2) :38. 被引量:1
  • 6A.A. Bubshait, S.A. Almohawis. Evaluating the general conditions of a construction contract[J]. International Journal of Project Management, 1994( 12):133-136. 被引量:1
  • 7周定山,孟宪海.工程合同文件缺陷索赔及案例[J].建筑经济,2003,24(3):41-44. 被引量:5
  • 8胡季英,关柯.我国建设工程合同管理存在的问题及对策探讨[J].建设监理,2003(4):29-30. 被引量:18
  • 9邱闯.国际工程合同中业主违约下的损害赔偿[J].建筑经济,2001,22(1):22-24. 被引量:3
  • 10Genus. Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel [J]. Research Policy, 1997 (26): 169-189. 被引量:1

二级参考文献11

  • 1林梅.建设项目委托代理关系及其治理机制[J].建筑经济,2005,26(4):15-17. 被引量:7
  • 2严玲,赵黎明.论项目治理理论体系的构建[J].上海经济研究,2005,17(11):104-110. 被引量:35
  • 3Keith Lambert. Project Govemance[J].World Project Management Week,2003(3):8-9. 被引量:1
  • 4Sappington D.E. Incentive in principal-Agent Relationship [J]. The Journal of Economic Perspective, 1973 (2): 45-66. 被引量:1
  • 5Joel Sobel.Informational control in the principal-agent problem[J].International Economic Review,1993(2): 259-269. 被引量:1
  • 6Floricel S, Miller R. Strategizing for anticipated risks and turbulence in large scale engineering projects [J]. International Journal of Project Management, 2001(19):445-455. 被引量:1
  • 7Chanoenngam C,. Chien-Yuan Yeh. Contractual risk and liability sharing in hydropower construction [J]. International Journal of Project Management, 1999 (1):29-37. 被引量:1
  • 8Turner J. R., Muller, R. On the Nature of the Project as a Temporary Organization[J]. International Journal of Project Management, 2003(21):1-7. 被引量:1
  • 9Holmstrom, B, Milgrom, P. Multitask principal-agent analyses: incentive contracts, asset ownership, and job design [J]. Journal of Law,Economics & Organization, 1991(7):24-52. 被引量:1
  • 10Sharma, Arun and Jagdish N. Sheth. Relationship Marketing: An Agenda for Inquiry [J]. Industrial Marketing Management, 1997(26):87-89. 被引量:1

共引文献29

同被引文献84

引证文献7

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部