柳坪水电站引水隧洞底拱使用自行式台车进行底拱衬砌,在质量、进度、效益等方面都达到最佳。
The concrete lining works of the bottom arch of the diversion tunnel of Liuping Hydropower Station is constructed with the self-developed portal lining jumbo,the indeces of the concrete quality,rate of construction progress and economic benefits all reached the best.