摘要
戈兰滩水电站是云南省李仙江上7个梯级电站中的第6级,由云南大唐国际李仙江流域水电开发有限公司建设和运营,现已投产。基于当地的建设环境和设计条件,电站机电工程设计具有一定的特点。
Gelantan hydropower Station is the sixth cascade in the seven cascades hydropower stations of Lixianjiang River in Yunnan Province,it is constructed and operated by China Datang Corporation,now it has been put into operation.On the basis of local construction environment and design conditions,the E&M design of the project has some unique features.
出处
《水利水电工程设计》
2009年第B10期35-39,59,共5页
Design of Water Resources & Hydroelectric Engineering