观音岩水库高输水隧洞除险加固设计 被引量:2

Danger Control and Reinforcement Design of High Water Conveyance Tunnel of Guanyinyan Water Control Project
下载PDF
导出
摘要 现状的观音岩水库枢纽工程由主坝、非常溢洪道自溃坝、溢洪道、挡坝、高输水隧洞、低输水管等建筑物组成。建成后经过40多年的运行,经鉴定,观音岩水库大坝安全性评定为三类坝,属于病险水库,需要进行除险加固设计。针对枢纽中的高输水隧洞存在的主要问题,例如:洞身过流能力不足、混凝土碳化严重、裂缝以及设备老化等,进行除险加固设计。 The Guanyinyan water control project consists of main dam,emergency spillway fuse-plug dam,spillway,retaining dam,high water conveyance tunnel,low conduit pipe,etc.After 40 years of operation,the security of the project is evaluated as Class III,which is dangerous and needs danger control and reinforcement.The design will mianly on the problems existing in high water conveyance tunnel,e.g.insufficient water carrying capacity,serious carbonization of concrete,crack and equipment aging,etc.
出处 《水利水电工程设计》 2009年第4期5-7,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 隧洞 过流能力 碳化 裂缝 除险加固 观音岩水库 tunnel,water carrying capacity,carbonization,crack,danger control and reinforcement,Guanyinyan reservoir.
  • 相关文献

同被引文献7

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部