摘要
以四川省江油市重华镇一栋3层砖混结构为例,输入汶川地震中当时当地地震动,进行非线性时程分析,并与实际震害进行了比较,结果表明:时程分析法中采用的四折线恢复力模型合理,各特征点参数选取正确;分析结果与实际震害吻合较好,时程分析法可以可靠地分析砌体结构的非线性性态。
With a certain brick-concrete composite building, which is located in Chonghua Town,Jiangyou city,Sichuan province, as a practical example, a nonlinear time-history analysis is made of the building, with the then local quaking record in Wenchuan earthquake input into it. The result is compared with that of the actual earthquake damage, the result of which shows that the use of the 4-polyline method for the time-history analysis is reasonable, and parameters of characteristic points are correctly chosen. The result of the analysis coincides well with that of the actual earthquake damage,according to which the method of time-history analysis is found to be able to be safely used for analyzing the nonlinear behavior of masonry structures.
出处
《国防交通工程与技术》
2009年第6期46-48,67,共4页
Traffic Engineering and Technology for National Defence
关键词
砖混结构
非线性时程分析
地震动
反应谱
位移
剪力
brick-concrete composite structure
nonlinear time history analysis
ground motion
response spectrum
displacement
shear