摘要
以压水堆核电厂蒸汽发生器管子支撑板的制造过程为研究对象,运用多目标模糊决策动态规划理论对其技术方案进行优化,获得了满意的结果.
The manufacturing process of steam- generator supporting-plate applied inPressurized Water Reactor (PWR) of nuclear power plant is dealt with in the paper. The techni-cal schedule of manufacturing process is optimized by applying the theory of multi-goal fuzzyoptimization dynamic programming and a satisfying result is obtained.
出处
《上海理工大学学报》
CAS
1998年第3期247-250,共4页
Journal of University of Shanghai For Science and Technology
关键词
蒸汽发生器
支撑板
多目标系统
模糊优选
压水堆
steam -generator
supporting-plate
multi-goals system
fuzzy optimal choice, dynamicprogramming