期刊文献+

工程项目的风险指数建模及仿真分析 被引量:3

Project Risk Value Modeling and Simulation Analysis
下载PDF
导出
摘要 针对工程项目的返工迭代现象造成项目的进度风险和费用风险,提出了改进的项目风险指数模型,并建立仿真模型分析单一风险和组合风险。在任务执行时间不确定和最优执行顺序已知的条件下,考虑费用与进度的关系服从Weibull分布,同时还考虑返工迭代的随机性和学习效应对项目进度的影响。通过仿真算例分析,验证了风险指数模型描述项目风险的有效性和动态性。 The design structure matrix method is used in risk estimate and control of project management. An improved risk index model is proposed for schedule risk and cost risk by reason of rework iteration. The simulation model based on design structure matrix is applied to analyze single risk and combination risk in large-scale project. On the condition of uncertain execute time and given optimal execute sequence of tasks, relation between cost and schedule is Weibull distribution. Random nature of rework iteration and learning effect are also taken into consideration during executing process. Simulation example proves that the risk index for project management is validity and dynamicity.
出处 《科技进步与对策》 CSSCI 北大核心 2009年第21期81-84,共4页 Science & Technology Progress and Policy
基金 国家自然科学基金项目(70871002)
关键词 风险指数 学习效应 返工 仿真 Risk Index Learning Effect Rework Simulation
  • 相关文献

参考文献4

二级参考文献37

  • 1廖祖仁,产品寿命周期费用评价法,1993年 被引量:1
  • 2阮镰,工程系统的规划与设计,1991年 被引量:1
  • 3钱颂迪,数量经济技术经济研究,1986年,10卷,15页 被引量:1
  • 4Norden Peter V,中美系统分析讨论论文集,1983年 被引量:1
  • 5阿姆斯塔特 B L,可靠性数学,1978年 被引量:1
  • 6徐哲,航天技术通讯,1996年,6期,26页 被引量:1
  • 7李伯亭,数量经济技术经济研究,1993年,11卷,21页 被引量:1
  • 8团体著者,工程项目管理手册,1992年 被引量:1
  • 9阮镰,工程系统的规划与设计,1991年 被引量:1
  • 10冯允成,活动网络分析,1991年 被引量:1

共引文献40

同被引文献37

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部