4John M, Strappler G. Design and installation of tube umbrellas in soft ground tunneling[A]. Progress in Tunneling after 2000[C]. [s.l.]: [s.n.], 2001, 253-260. 被引量:1
5Mair R J. Settlement effects of bored tunnels[A].Geotechnical Aspects of Underground Construction in Soft Ground[C]. [s.l.]: Balkema, 1996, 43-53. 被引量:1
6Mair R J, Taylor R N, Bracegirdle A. Subsurface settlement profiles above tunnels in clays[J]. Geotechnique,1993, 43 (2): 315-320. 被引量:1
9Donovan K,Pafiseau W G,Cepak M.Finite element approach to cable bolting in steeply dipping VCR slopes[M]//Geomechanics Application in Underground Hardrock Mining.New York:Society of Mining Engineers,1984:65-90 被引量:1
10MARTOS F.Concerning an approximate equation of the subsidence trough and its time factors[C]//International Strata Control Congress.Leipzig:[s.n.],1958:191-205. 被引量:1