储能装置延缓配电网升级的探讨 被引量:16

Study on energy storage devices to defer distribution network capacity upgrade
下载PDF
导出
摘要 研究储能装置在系统稳态时作为负荷平衡应用——延缓配电网升级——的可能性,量化储能技术收益,给出储能单元的功率和能量计算方法,并结合实际算例讨论储能装置安装地点的选择及其对线路损耗的影响.分析储能装置应用于配电网升级延缓时需要注意的几个重要问题,对于储能技术在电力系统中的应用具有重要的指导意义. This paper discusses the possibility of energy storage devices as load balancing application, which is delaying utility investments in distribution network upgrades. The benefit of the distribution network capacity deferral value is quantified, and power and energy capacities for electricity energy storage systems are estimated. A practical system is utilized to evaluate the proposed methodology, and the siting of energy storage devices and its impact on the network loss are discussed. Finally, some important aspects of the application are analyzed. The main intention is to contribute to the development of methodologies that help understanding the role of energy storage in a distribution system.
出处 《电力科学与技术学报》 CAS 2009年第3期33-39,共7页 Journal of Electric Power Science And Technology
基金 国家自然科学基金(50477032) 浙江省电力公司科技计划资助项目
关键词 储能 配电网 容量升级 升级延缓收益 energy storage distributed network capacity upgrade upgrade deferral
  • 相关文献

参考文献9

  • 1Schoenung S M, Burns C. Utility energy storage applications studies [J]. IEEE Transactions on Energy Conversions, 1996, 11 (3): 658-665. 被引量:1
  • 2Chacra F A, Bastard P, Fleury G, et al. Impact of energy storage costs on economical performance in a distribution substation [ J ]. IEEE Transactions on Power Systems, 2005, 20(2) : 684-691. 被引量:1
  • 3Jung K J, Kim H, Rho D. Determination of the installation site and optimal capacity of the battery storage system for load leveling[ J]. IEEE Transactions on Energy Conversion, 1996, 11 ( 1 ) : 162-167. 被引量:1
  • 4Ball G J, Benjamin G C, Norris L. Government, industry and utility development and evaluation of a modular utility battery energy storage system [ J ]. IEEE Transactions on Energy Conversion, 1995, 10(3) : 549-554. 被引量:1
  • 5Lachs W R, Sutanto D. Battery storage plant within large load centres[J]. IEEE Transactions on Power Systems, 1992, 7(2) : 762- 769. 被引量:1
  • 6Baumann P D. Energy conservation and environmental benefits that may be realized from superconducting magnetic energy storage[ J]. IEEE Transactions on Energy Conversion, 1992, 7(2): 253-259. 被引量:1
  • 7Narayan S R, Blane Taylor. A central inventory of storage and other technologies to defer distribution upgrades-optimization and economics[ J]. IEEE Transactions on Power Delivery, 1998, 13 ( 1 ) : 194- 202. 被引量:1
  • 8Gil H A, Joos G. On the quantification of the network capacity deferral value of distributed generation [ J ]. IEEE Transactions on Power Systems, 2006, 21 (4) : 1 592-1 599. 被引量:1
  • 9Eyer J, Iannucci J. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral, A study for the DOE energy storage program ( Draft Report) [ R ]. USA: Sandia National Laboratories, Energy Storage Program, Ofiqce of Electric Transmission and Distribution, U.S. Department of Energy, 2004. 被引量:1

同被引文献106

引证文献16

二级引证文献148