摘要
文章介绍了破罡湖新站设计方案中,立式抽芯式轴流泵与常规的立式轴流泵方案比较及立式抽芯式轴流泵方案选择。
In the Pogang lake new station design proposal,comparison of vertical pulls out the core type axial flow pump and the conventional vertical axial flow pump plan and the choice of vertical pulls out the core type axial flow pump plan are introduced.
出处
《安徽水利水电职业技术学院学报》
2009年第3期69-71,共3页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
立式抽芯式轴流泵
竖井筒体式结构
簸箕形流道结构
vertical pulls out the core type axial flow pump
vertical well chamber writing style structure
dust pan shape flow channel structure