摘要
瀑布沟大坝反滤料加工系统建成后,由于原设计标准的提高,导致该系统生产的反滤料不能满足设计要求。为此对该系统进行了一系列改进,其中针对反滤料中石粉含量偏高以及级配不连续等问题所进行的改进对其它相关反滤料加工系统具有一定的参考作用。
After the complete of the filter material processing system for the construction of Pubugou Dam, the filter material produced by the system can not meet the design requirement concerned due to the raising of the original design criteria. Therefore, a series of improvements are made on the system, in which the improvements for solving the problems of the higher content of stone powder and the discontinuity of the size gradation can provide certain references for the other relevant filter material processing systems.
出处
《水利水电技术》
CSCD
北大核心
2009年第10期21-24,30,共5页
Water Resources and Hydropower Engineering
关键词
瀑布沟水电站
反滤料加工系统
设计
Pubugou Hydropower Station
filter material processing system
design