摘要
文章分析了粤东电网在枯水期和丰水期运行中存在的问题,介绍了解决上述问题的一些做法,提出完善粤东网络建设的必要性。
This paper describes the problems in operation of East Guangdong power network during both dry and rainy seasons and its countermeasures. The necessity of improving the East Guangdong power network is presented.
出处
《电网技术》
EI
CSCD
北大核心
1998年第6期76-77,79,共3页
Power System Technology
关键词
粤东电网
稳定极限
过载联切装置
运行
配电网
East Guangdong power network Stability limit Ring splitting Load shedding scheme