摘要
通过工程实例介绍了深层搅拌桩施工遇障碍物的一种经济有效的解决方法,对类似工程具有一定的指导意义。
Engineering cases are taken to introduce an economic solution to underground obstacles met with deeplayered agitating pile, which has a certain instructive significance for similar engineerings.
出处
《西部探矿工程》
CAS
1998年第4期27-28,共2页
West-China Exploration Engineering