期刊文献+

基于主机负载的任务执行时间预测研究 被引量:3

Research of task execution time based on host load
下载PDF
导出
摘要 在网格计算中,预测网格节点性能的动态变化和网格任务的执行情况是影响网格任务高效调度是否成功的最重要因素之一。结合主机负载和任务执行时间的线性关系,研究分析了一种基于主机负载的任务执行时间预测算法。利用仿真实现了这种算法,对基于主机负载实现任务执行时间预测的可靠性进行了实验论证,并给出了预测精度的评价结果。 In the grid computing, the prediction of the dynamic change of network node performance and the implementation of the grid task is one of the most important factors, which deeides whether the efficient scheduling of grid task will be successful. In this dissertation, the authors studied and analyzed an algorithm predicting the execution time of task by the linear relationship between host load and the execution time of task. Then the authors simulated the prediction algorithm about the task execution time, validated the reliability of the execution time prediction of the task based on host load, and evaluated its prediction precision.
出处 《计算机应用》 CSCD 北大核心 2009年第10期2617-2619,2623,共4页 journal of Computer Applications
关键词 网格 主机负载 任务执行时间 性能预测 grid host load task execution time performance prediction
  • 相关文献

参考文献6

  • 1都志辉等编著..网格计算[M].北京:清华大学出版社,2002:181.
  • 2REED D A, MENDEC C L. Intelligent monitoring for adaptation in grid applications[ J]. Proceedings of the IEEE, 2005, 93(2) : 426 - 435. 被引量:1
  • 3JAMSHED M, KHALIQUE S, SUGURI H, et al. Grid node monitoring architecture for autonomous resource management[ J]. Broadband Networks, 2005,2:1362 - 1369. 被引量:1
  • 4DINDA P A, O'HALLARON D R. The statistical properties of host load[ C]// LCR 98: Fourth Workshop on Languages, Compilers, and Run-time Systems for Scalable Computers. The Netherlands: IOS Press, 1998:1 -23. 被引量:1
  • 5Load trace archive[ EB/OL]. [ 2009 - 01 - 01 ]. http://www. cs. northwestern. edu/- pdinda/LoadTraces/. 被引量:1
  • 6Load trace playback[ EB/OL]. [ 2009 - 01 - 01 ]. http://www.cs. northwestern. edu/-pdinda/LoadTraces/playload/playload. 被引量:1

同被引文献26

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部