基于模糊影响图的新产品研发项目风险评估分析 被引量:5

New product R&D risk assessment based on fuzzy influence diagram
下载PDF
导出
摘要 在系统分析新产品研发项目风险要素的基础上,针对新产品研发风险因素的影响关系及所引起的后果得不到确切表示的问题,引入了模糊影响图算法。根据定性分析绘制了一个具体的新产品研发项目风险影响图,然后应用模糊影响图评价算法,计算出该新产品研发项目风险发生可能性的累计概率。结果表明,应用模糊影响图评价新产品研发风险,关键在于确定结点状态与频率之间以及结点之间的模糊关系。 Based on the systematic analysis of the risk factors of new product R&D, aiming at the interactive relationship of risk factors and the consequences that cann't be exactly represented, the fuzzy influence diagram method is applied in the evaluation process. According to qualitative analysis, the influence diagram of a new product R&D project risk was drawn. Then, the probability of the risk occurrence is calculated through fuzzy influence diagram evaluation algorithm. The conclusion indicates that the key to apply the method is to confirm the fuzzy relations.
出处 《科技与管理》 CSSCI 2009年第5期75-77,81,共4页 Science-Technology and Management
关键词 新产品研发 模糊影响图 风险评估 new product R&D fuzzy influence diagram risk assessment
  • 相关文献

参考文献11

  • 1DAVILA T. An empirical study on the drives of management controlsystems'designinnewproductdevelopm.ent [J]. Aceounting, Organizationsand Society, 2000,(25):383-409. 被引量:1
  • 2MULINS J W,FORLANI D,WALKER O C. Fect of organizational and decision-maker factors on new product risk taking [J]. Journal of Product Innovation Management,1999, (16):282- 294. 被引量:1
  • 3SMITH P G. Managing risk as product development schedules shrink [J]. Research and Technology Management, 1999(9):25- 32. 被引量:1
  • 4JESUS S, AGUILAR R, ISABEL R. An evolutionary approach to estimatesoftwaredevelopmentProjects[J]. Information and Software Technology,2001, 22-30. 被引量:1
  • 5GARVEY P,PHAIR D. An information architecture for risk assessment and mangement [J]. IEEE Software, 1997 (5):25- 35. 被引量:1
  • 6AKOMODE O, LEE B.Evaluating risk in new product development and assessing the satisfaction of customers through information technology [J].Production Planning & Control, 1999 ( 1 ): 35-47. 被引量:1
  • 7GARAVELLI A C ,GORGOGLIONE M.Fuzzy logic to improve the robustness of decision support systems under uncertainty[J]. Computers and Industrial Engineering, 1999,37:477-480. 被引量:1
  • 8JOVANOVIC P.Application of sensitivity analysis in investment project evaluation under uncertainty and risk [J].International Journal of Project Management, 1999,4:217-222. 被引量:1
  • 9刘金兰,韩文秀,李光泉.关于工程项目风险分析的模糊影响图方法[J].系统工程学报,1994,9(2):81-88. 被引量:18
  • 10程铁信,王平,张伟波.模糊影响图评价算法的探讨[J].系统工程学报,2004,19(2):177-182. 被引量:22

二级参考文献6

  • 1刘金兰,韩文秀,李光泉.关于工程项目风险分析的模糊影响图方法[J].系统工程学报,1994,9(2):81-88. 被引量:18
  • 2赵汝怀,模糊系统理论,1982年 被引量:1
  • 3Tamim T S.An Influence Diagramming Based Risk Analysis System[D].Boulder:University of Golorado at Boulder,1989. 被引量:1
  • 4Shachter R D. Probabilistic inference and influence diagrams[J]. Operation Research, 1988, 36(4): 589-605. 被引量:1
  • 5Shachter R D. Evaluating influence[J]. Operation Research, 1986, 34(6): 871-882. 被引量:1
  • 6Chapman C B. Large engineering project risk analysis[J]. IEEE Transactions on Engineering Management, 1979, 26(3): 78-86. 被引量:1

共引文献30

同被引文献56

引证文献5

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部