4Yan-Chyuan Shiau, Ming-Teh Wang, Tsung-Pin Tsai, Wen-Chian Wang, DEVELOPING A CONSTRUCTION INTEGRATED MANAGEMENT SYSTEM (R).International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards andT echnology, Gaithersburg, Maryland. September 23-25,2002, 27-33 pp, 2002. 被引量:1
5McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141. 被引量:1
6Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241. 被引量:1
7Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327. 被引量:1
8Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256. 被引量:1
9Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116. 被引量:1