上游河道缩窄对泸定河段水流影响分析 被引量:1

Analysis on influence of narrowed river channel in upper reaches on water flow of Luding reach
下载PDF
导出
摘要 以泸定电站上游堤防工程为例,采用河道平面二维数学模型对堤防工程修建前后的水流变化进行了数值模拟和计算,为工程的可行性认证提供初步依据。计算结果表明:堤防工程修建后,无论泸定电站修建前还是建成蓄水后,河段均出现两个壅水区和两个跌水区;主河道流速变化不大,主流位置和主流带流速稍微右移。对同类工程的论证有借鉴和参考作用。 Taking the levee in the upper reach of Luding station as an example,the paper uses numerical method to simulate the water flow changes before and after the construction of levee by the mathematical model of the two-dimensional plane river course.The results show that,after the construction of the levee project,regardless of Luding power station built before or run yet,there are two river backwater areas and waterfall areas,the velocity of the main course of river changes little,and the main stream position and its velocity move right slightly.This result gives reference to other similar projects.
出处 《人民长江》 北大核心 2009年第15期80-82,97,共4页 Yangtze River
基金 国家自然科学基金资助项目(50579054)
关键词 平面二维 数学模型 堤防工程 泸定电站 plane two-dimension mathematical model levee project Luding Hydropower Station
  • 相关文献

参考文献5

二级参考文献15

  • 1徐群 李浩麟.瓯江大桥至鱼旗山防洪堤外移工程物理数学模型试验研究[R].南京:南京水利科学研究院,2001.. 被引量:1
  • 2陆永军 李浩麟.瓯江大桥至鱼旗山防洪堤外移工程二维潮流数学模型研究[R].南京:南京水利科学研究院,2001.. 被引量:1
  • 3罗肇森 孙梅秀.河工模型中几种人工糙率的计算.水利水运科学研究,1981,(02). 被引量:8
  • 4Xu H,Int J Numer Method Fluids,1998年,28期,1265页 被引量:1
  • 5Jian Ye,J Hydraulic Eng(ASCE),1997年,123卷,5期 被引量:1
  • 6金忠青,N-S方程数值解及紊流模型,1996年 被引量:1
  • 7Rhie C M,AIAA J,1983年,21卷,11期 被引量:1
  • 8帕坦卡SV 张政译.传热与流体流动的数值计算[M].北京:科学出版社,1984.70-77. 被引量:48
  • 9张瑞瑾 谢鉴衡 王明甫.河流泥沙动力学[M].北京:水利电力出版社,1988.. 被引量:10
  • 10Thomson J F,Frank C Thames and C.Wayne Mastin,TOMCAT-A Code for numerical generation of boundary-fitted curvilinear coordinate system on fields containing any number of arbitrary two-dimensional bodies.J.of computional physics,1977,24:274 -302. 被引量:1

共引文献52

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部