摘要 青岛胶州湾隧道工程全长7800 m,下穿海域3950 m。有两条主隧道和一条服务隧道,在青岛端距离洞口2000 m处设有进出海底隧道的匝道。主隧道海域段线间距约55 m,断面为椭圆形断面,隧道断面宽16 m,高12 m,隧道洞身主要位于微风化花岗岩、辉绿岩、安山岩中,纵断面采用"V"字坡,最大海水深42 m,隧道最小埋深不小于30 m。对钻爆法修建青岛胶州湾海底隧道的关键技术和大型施工机械配套进行了探讨。 Qingdao Jiaozhouwan tunnel is 7 800 m, and subsea tunnel is 3 950 m. There are 2 main traffic tunnels and 1 serving tunnel. Accessorial tunnel passing in or out the main traffic tunnel is founded at 2 000 m part from gate in Qingdao. Space between the center lines of the 2 main traffic subsea tunnesl is 55 m. The section is oblong, width is 16 m, and height is 12 m. The tunnel is through slightly weathering granite, dolerite and andes- ite. Its vertical section is "V" slope. The maximum seawater depth is 42 m and the minimal rock cover depth is 30 m. The key tunneling technology and configuring big machines of drilling and blast for constructing Qingdao Jiaozhouwan subsea tunnel were discussed in this thesis.
作者 马栋 谭忠盛
出处 《中国工程科学》 2009年第7期45-52,共8页 Strategic Study of CAE
关键词 胶州湾海底隧道 钻爆法 施工 机械配套 Jiaozhouwan subsea tunnel drilling & blast construct configuring big machines
  • 相关文献

同被引文献36

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部