摘要
对顶管施工方法工艺的特点、管材选择、顶力计算和顶距确定、工作坑和接收坑选用及尺寸确定等方面进行了分析,并提出了顶管法施工应注意的一些事项,以推广顶管技术的应用。
The pipe driving construction method characteristics, pipe material choice, pipe driving force calculation and apex distance determination, working pit and receiving pit selection and size determination were analyzed. Some matters need attention in pipe driving construction was proposed, so as to popularize pipe driving technology application.
出处
《山西建筑》
2009年第21期133-134,共2页
Shanxi Architecture
关键词
顶管施工方法
顶距
敞开式顶管
工作坑
接收坑
pipe driving construction method, apex distance, open type pipe thrusting, working pit, receiving pit