摘要
结合某铁路特大桥工程,针对悬臂施工连续梁桥的特点对施工要求和控制的方法进行了分析比较,选择了自适用控制方法对此铁路特大桥连续梁进行了施工控制,积累了连续梁桥悬臂施工经验。
Combining a project of super-huge railway bridge, the paper analyzes constructional requirements and controlling methods aiming at features continuing bridge's cantilever. The self-suited controlling methods were adopted for the construction super-hnge railway bridge. This paper accumulates experiences for such kind of construction.
出处
《山西建筑》
2009年第20期340-341,共2页
Shanxi Architecture
关键词
连续梁桥
悬臂施工
合龙段
体系转换
continuing bridge, cantilever construction, joining up area, system transfer