黄泥河老江底水电站水轮机安装高程的计算方法

Method for Calculating Setting Elevation of Hydraulic Turbine of Laojiangdi Water Power Plant in Huangnihe River
下载PDF
导出
摘要 以黄泥河老江水电站为例分析该类型水电站水轮机安装高程的计算方法,该类型水电站的特点是水头变幅大,而且运行水头主要取决于下游水位。文中分析的方法与水电站机电设计手册介绍的传统计算方法相比较为合理、经济,可供同行在类似电站设计中参考。 Taking the Laojiangdi Water Power Plant as for example,the method for calculating setting elevation of hydraulic turbine is analyzed. The character of this water power plant is width in water head varies range, and the water head is determined by the tail water level. The method is more reasonable and economical than other methods introduced in the designing manual of mechanical and electric for water power plant. It can be taken as reference for others water power plants.
出处 《水资源与水工程学报》 2009年第3期91-93,共3页 Journal of Water Resources and Water Engineering
关键词 水轮机 安装高程 老江底水电站 hydraulic turbine setting elevation Laojiangdi Water Power Plant
  • 相关文献

参考文献5

  • 1水电站机电设计手册编写组.水电站机电设计手册(水力机械)[M].北京:水利电力出版社,1982. 被引量:1
  • 2哈尔滨大电机研究所编.水轮机设计手册[M].北京:机械工业出版社,1976.30-31. 被引量:10
  • 3聂荣升.水轮机中的空化与空蚀[M].北京:水利电力出版社,1985.. 被引量:6
  • 4GB/T11805-1995.水轮机基本技术条件[s]. 被引量:1
  • 5GB/T5186-2004.水电厂机电设计规范[s]. 被引量:1

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部