以黄泥河老江水电站为例分析该类型水电站水轮机安装高程的计算方法,该类型水电站的特点是水头变幅大,而且运行水头主要取决于下游水位。文中分析的方法与水电站机电设计手册介绍的传统计算方法相比较为合理、经济,可供同行在类似电站设计中参考。
Taking the Laojiangdi Water Power Plant as for example,the method for calculating setting elevation of hydraulic turbine is analyzed. The character of this water power plant is width in water head varies range, and the water head is determined by the tail water level. The method is more reasonable and economical than other methods introduced in the designing manual of mechanical and electric for water power plant. It can be taken as reference for others water power plants.