期刊文献+

广西长洲水利枢纽项目安全监测仪器埋设方法经验谈 被引量:2

Discussion on embedment method of safety monitoring instruments for Changzhou water project
下载PDF
导出
摘要 通过对安全监测项目实际施工状况分析,提出在满足仪器工作原理和设计意图的条件下,根据施工环境、地质条件的特殊性,采取合理的安装方式是监测仪器安装成败的关键。仪器应用条件改变时各方需充分考虑仪器在新工况下的适应性、安全性。仪器设计原理和实际应用之间的跨越要靠现场监测工作来完成,故对适合工况的仪器安装方式进行探索和实践是有积极意义的。 Through analysis of real construction conditions for safety monitoring works, it is proposed that under the condition of meeting the working principles of instruments and design intents, application of proper installation method according to construction environment and geological conditions is critical to the successful installation of instruments. The applicability and safety of instruments under new conditions shall be fully considered when application conditions are changed. The discrepancy between instrument design principle and practical application needs to be settled by in -situ monitoring. Therefore, it has a positive significance to seek for and implement an instrument installation method suitable to actual conditions.
出处 《西北水电》 2009年第3期61-64,共4页 Northwest Hydropower
关键词 安全监测 仪器埋设 施工状况 适应性 安全性 safety monitoring instrument embedment construction conditions applicability safety
  • 相关文献

参考文献2

  • 1DL/T5178-2003.混凝土坝安全监测技术规范[S].[S].,.. 被引量:65
  • 2SL60-90,土石坝安全监测技术规范[S]. 被引量:1

共引文献64

同被引文献22

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部