为了建设工程合同价款的合理性、合法性,减少履行合同甲乙双方的纠纷,维护合同双方利益,有效控制工程造价,作者就当前在调整施工合同价款过程中遇到主要问题谈谈处理对策。
Construction contract for a reasonable price, legality, and B to reduce the performance of the contract dispute between the two sides, and safeguard the interests of both contracts, the effective control of project cost, the authors on the current construction contract price during the adjustment process to talk about the main problems encountered in dealing with countermeasures.
出处
《福建建筑》
2009年第6期113-114,共2页
Fujian Architecture & Construction
关键词
合同价款
施工合同
工程签证
合理调整
Contract price Construction contrac Works reasonably adjust Visa.