摘要
叙述了变电站自动化系统现场调试的工作内容,根据现场调试中发现的问题,阐明了对GPS对时、软硬压板、定值修改、防跳回路、电源配置原则、通信接口、网络结构等问题的看法,并提出了相应的解决对策,以利优化设计和改进现场调试工作。
The paper describes the contents of on-site commissioning test of substation automation system. Fo- cusing on the problems found in on-site commissioning test, the opinions in aspects of GPS time setting, soft- hard platen, setting values modification, breaker anti-tripping circuit, power sources configuration principle, communication interface and network structure are clarified. Finally the suggestion of corresponding counter- measures is presented to help optimizing the design and improving on-site commissioning test.
出处
《供用电》
2009年第3期39-41,共3页
Distribution & Utilization
关键词
变电站自动化系统
现场调试
对策
substation automation system
on-site commissioning test
countermeasure