摘要 日本的特高压技术对中国特高压输电研究有借鉴意义,但是,中日两国国情不同,电网情况也不同,中国特高压输电工程建设必须走自主创新的近路。为此对中国和日本的特高压输电系统过电压和绝缘配合方面的技术进行分析比较,包括工频暂时过电压,操作过电压以及潜供电流的限制措施和水平,线路和变电站的防雷措施,变电站设备的绝缘水平选择,线路和变电站外绝缘空气间隙距离选择。这种比较有利于拓宽思路,对今后的各国特高压输电工程建设可能有所帮助。 Japanese UHV technology has reference meaning for Chinese UHV transmission system research. However, Chinese national condition and Japanese national condition are different and the power system between two countries is also different. Chinese UHV transmission project must go the self-innovation way. This paper Compares and analyses both Chinese and Japanese technology of UHV AC transmission system over-voltage and insulation coordination, which include the following: the suppress methods and level of the temporary over-voltage, switching overvoltage; second arc current; lightning protection methods for transmission line and substation, the selection of substation apparatuses insulation and air clearance of transmission line and substation external insulation.This comparison is beneficial to broaden minds and helpful in later construction of UHV transmission project in other countries.
出处 《高电压技术》 EI CAS CSCD 北大核心 2009年第6期1248-1253,共6页 High Voltage Engineering
基金 国家"十一五"科技支撑计划重大项目(2006BAA02A02)~~
关键词 特高压 输电 过电压 绝缘配合 中国 日本 UHV power transmission overvoltage insulation coordination China Japan
  • 相关文献

参考文献16

  • 1Watanabe T. Insulation coordination for UHV system.. CIGRE 33-101[C]//CIGRE. Paris, France: CIGRE, 1998. 被引量:1
  • 2电力部科技司.特高压输变电技术(二)日本1000kV交流输电线路[R].北京:电力部科技司,1994. 被引量:2
  • 3谷定燮,陆宠惠.日本特高压系统过电压和绝缘配合[J].中国电力,1998,31(11):67-69. 被引量:20
  • 4谷定燮,戴敏.1000kV特高压交流同塔双回输电系统过电压和绝缘配合研究[R].武汉:国网电力科学研究院,2008. 被引量:1
  • 5刘振亚主编..特高压交流输电系统过电压与绝缘配合[M].北京:中国电力出版社,2008:106.
  • 6国家电网公司.特高压交流同塔双回输电工程对日咨询出国报告[R].北京:国家电网公司,2008. 被引量:2
  • 7Tokyo Electric Power Company. Consulting service on overvolvage analysis and insulation coordination of double-circuit 1000 kV project of China[R]. Tokyo, Japan: Tokyo Electric Powr Company, 2008. 被引量:1
  • 8Yamagata Tanaka Y. Suppression of VFT in 1100 kV GIS by adopting resistor-fitted diseonnector[J]. IEEE Transactions on Power Delivery, 1996, 11(2): 872-880. 被引量:1
  • 9Yamagata Y. Development of 1100 kV GIS-gas circuit breakers disconnectors and high-speed grounding switches: SC 13-304[C]//CIGRE^* 1996 Paris Session. Paris, France: CIGRE,1996. 被引量:1
  • 10Hemmi R.快速暂态过电压(VFTO)的评估及其在未来GIS变电站中执行断路操作时,通过并联电阻器的抑制方法[C]∥2006年特高压输电国际会议.北京,2006. 被引量:1

二级参考文献23

  • 1谷定燮,樊灵孟.对我国500kV线路防雷的新思考[J].电力技术(北京),2004,37(12):18-21. 被引量:55
  • 2谷定燮,陈志达.我国500kV同塔双回线路绝缘方式选择[J].中国电力,2005,38(3):40-42. 被引量:10
  • 3电力部科技司.特高压输变电技术(二)日本1000kV交流输电线路[R].北京:电力部科技司,1994. 被引量:1
  • 4日本电力中央研究所.187kV-1190kVの交流架空送电线の电气设计ハンドブツク[R].东京:日本电力中央研究所,1986. 被引量:1
  • 5最近はぉける雷研究の动向ょ问题点[J].日本《电气学会技术报告(Ⅱ)部》,第789号,1988(8):1-13. 被引量:1
  • 6谷定燮,戴敏.1000kV特高压交流同塔双回输电系统过电压和绝缘配合研究[R].武汉:国网电力科学院武汉院区,2008. 被引量:1
  • 7谷定燮,戴敏.1000kV特高压交流同塔双回输电线路雷电性能的计算研究[R].武汉:国网电力科学院武汉院区,2008. 被引量:1
  • 8国家电网公司.特高压交流同塔双回输电工程对日咨询出国报告[R].北京:国家电网公司,2008. 被引量:2
  • 9Tokyo Electric Power Company. Consulting service on over-voltage analysis and insulation coordination of double circuit 1000 kV project of China[R]. Tokyo: Tokyo Electric Power Company, 2008. 被引量:1
  • 10DL/T620-1997.交流电气装置的过电压保护和绝缘配合[S].[S].,.. 被引量:336

共引文献99

同被引文献300

引证文献25

二级引证文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部